Greencity Hotel and Office Building / Gigon / Guyer Architekten

Greencity Hotel and Office Building / Gigon / Guyer Architekten - Exterior Photography, Windows, FacadeGreencity Hotel and Office Building / Gigon / Guyer Architekten - Interior Photography, Windows, FacadeGreencity Hotel and Office Building / Gigon / Guyer Architekten - Interior PhotographyGreencity Hotel and Office Building / Gigon / Guyer Architekten - Interior Photography, Windows, GlassGreencity Hotel and Office Building / Gigon / Guyer Architekten - More Images+ 7

  • Planning/Construction: Christian Maggioni (Team Manager 01/2015–), Barbara Schlauri (Team Manager –12/2014), Damien Andenmatten (Project Manager), Chiara Giovanola
  • Competition: Michael Winklmann (Team Manager 08/2012), Stefan Thommen (Team Manager –07/2012), Karla Pilz, Thomas Möckel, Lena Ehringhaus, Natalie Koerner
  • Fire Engineer: Gruner AG
  • City: Zurich
  • Country: Switzerland
More SpecsLess Specs
Greencity Hotel and Office Building / Gigon / Guyer Architekten - Exterior Photography, Windows, Facade
© Seraina Wirz

Text description provided by the architects. The mixed-use district Greencity, based on the principles of the 2000-watt society*, is under development on the former industrial site Sihlpapier Manegg in southern Zürich. Situated between the railroad tracks and the motorway, the seven-storey hotel and office building together with its eleven-storey neighbours forms the head of the new district facing the city centre. This ensemble frames a public courtyard, adjoining the elongated Maneggplatz.

Greencity Hotel and Office Building / Gigon / Guyer Architekten - Interior Photography, Windows, Facade
© Seraina Wirz

The oblong, lower building faces the tracks and street to the west as well as the courtyard. The latter is widened to piazza-like proportions by a tapering of the volume towards the north. Three covered recesses lead to the entrance halls of the different occupants. On the façades, overlapping horizontal and vertical elements of brown anodized sheet aluminium alternate with wood/metal windows and slender ventilation flaps. Depending on the point of view, openings and cladding, structure and envelope interpenetrate.

Greencity Hotel and Office Building / Gigon / Guyer Architekten - Image 8 of 12
Situation Plan
Greencity Hotel and Office Building / Gigon / Guyer Architekten - Image 9 of 12
Ground Floor Plan

The international design competition for the site was based on a preliminary plan that stipulated tall building volumes next to the motorway for offices and services. Gigon / Guyer’s urban design was awarded first prize and further development was split between two architecture firms.

Greencity Hotel and Office Building / Gigon / Guyer Architekten - Interior Photography, Stairs, Concrete, Handrail
© Seraina Wirz

The present project was initially planned exclusively as office space, and in a second phase, exclusively for hotel use. The uses are now combined: one-third office space, two-thirds hotel. The office space occupies the southern part of the upper floors and includes a lobby, staircase and lift core. The ground floor here houses a day-care centre with a separate entrance. The hotel reception welcomes guests on the street side, whereas the breakfast room and bar face the courtyard.

Greencity Hotel and Office Building / Gigon / Guyer Architekten - Interior Photography
© Seraina Wirz

A load-bearing skeleton of concrete columns, floor slabs and cores allows for various uses. The façade reflects the flexible partition grid of the floors as well as the construction, but at the same time this is overridden by the subtle offsets of the cladding, window frames and ventilation flaps between storeys. The tilting of the metal profiles contributes to multiple readings of the façade – creating impressions that are suitable both for the offices and the hotel.

Greencity Hotel and Office Building / Gigon / Guyer Architekten - Interior Photography, Windows, Glass
© Seraina Wirz

In accordance with the core-and-shell model, hotel and office tenants fit out their own spaces. However, lobbies, staircases and lift cores, connecting outside and inside, lower and upper floors, are coherent in appearance: polished concrete flooring echoes the load-bearing structure, while dark brown metal surfaces refer to the building envelope.

Project gallery

See allShow less

Project location

Address:Zurich, Switzerland

Click to open map
Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: "Greencity Hotel and Office Building / Gigon / Guyer Architekten" 08 Apr 2022. ArchDaily. Accessed . <https://www.archdaily.com/979824/greencity-hotel-and-office-building-gigon-guyer-architekten> ISSN 0719-8884